Video transcript
Tarcísio Gomes de Freitas - Durante mais de 100 anos, o Túnel Santos-Guarujá foi lembrado como um...
16 statements · 1 politicians · July 20, 2026 · 1 min
Statements by Tarcisio. 16 transcribed statements, with topic and stance on the ones the analysis classified. Topics: Infrastructure and Sanitation, Urban Mobility and Logistics, Political Governance, Private Financing.
Speakers
Click any statement beside the video to jump straight to the moment it was said.
Transcript
16 statementsFull transcript of the video. Statements the analysis classified carry topic and stance.
- Neutral
About: complete construction of the Santos-Guarujá Tunnel
Some projects are not merely large; they carry almost a century of waiting.
- Neutral
About: complete construction of the Santos-Guarujá Tunnel
Few people know it, but the idea of connecting Santos and Guarujá by a tunnel arose back in 1924, more than 100 years ago.
- Neutral
About: complete construction of the Santos-Guarujá Tunnel
Since then, many people dreamed, many projects were presented, a scale model was unveiled, but none managed to leave the drawing board.
- Neutral
About: build the tunnel between Santos and Guarujá
For decades, the crossing continued to rely on ferries, while millions of people faced queues, traffic jams and lost time every day.
- For
About: complete construction of the Santos-Guarujá Tunnel
When I was at the Ministry of Infrastructure, we resumed studying this project.
- Neutral
About: complete construction of the Santos-Guarujá Tunnel
For the first time, it began to take real shape.
- For
About: build the tunnel between Santos and Guarujá
I saw a project capable of transforming mobility in the Baixada Santista and strengthening one of the largest ports in Latin America.
- For
About: build the tunnel between Santos and Guarujá
When I took office as governor of São Paulo, I made a decision.
- For
About: complete construction of the Santos-Guarujá Tunnel
This century-old dream had to happen.
- For
About: complete construction of the Santos-Guarujá Tunnel
We assembled teams, completed the studies, structured the model, and adjusted the finances so the idea would stand on its own.
- For
About: build the tunnel between Santos and Guarujá
We went abroad to talk with investors and did the work that needed to be done.
- For
About: complete construction of the Santos-Guarujá Tunnel
And now, more than 100 years after the first idea, we held the auction that marks the start of this project.
- Neutral
About: complete construction of the Santos-Guarujá Tunnel
The Santos-Guarujá tunnel will be the first immersed tunnel in Brazil.
- For
About: build the tunnel between Santos and Guarujá
An unprecedented and grand engineering project that will reduce crossing time, improve the logistics of the Port of Santos, create thousands of jobs and transform the Baixada Santista.
- For
About: complete and deliver public works and investments in visited regions
For me, governing is that; it's not about inaugurating promises.
- For
About: complete construction of the Santos-Guarujá Tunnel
It's taking a dream that has spanned generations and working so that it stops being impossible.
AI classification from the transcript of a public video. See the Methodology