Sobre: elaborar e executar projetos para a linha 3 do metrô
Metro Line 3 doesn't have a project.
120 falas analisadas sobre Urban Mobility and Logistics. 73% dos políticos a favor, 7% contra, 20% neutros. Proposição mais discutida: "improve urban mobility and logistics".
Sobre: elaborar e executar projetos para a linha 3 do metrô
Metro Line 3 doesn't have a project.
Sobre: adotar o novo modelo de contrato para o trem urbano
I think this model was also the result of a judicial decision.
Sobre: recuperar e modernizar o sistema de trem urbano
So what I can tell you is this: we will do with Supervia the same as I did with the BIT.
Sobre: recuperar e modernizar o sistema de trem urbano
We're going to refurbish the stations, right?
Sobre: recuperar e modernizar o sistema de trem urbano
We'll create, the same way I made the Safe BRT, we'll create the 'safe train' so that the public can be in the stations properly, right?
Sobre: expandir a malha metroviária e ferroviária metropolitana
The top priority, without a doubt, is the train — the metro toward São Gonçalo, or from São Gonçalo toward the city of Rio de Janeiro.
Sobre: expandir a malha metroviária e ferroviária metropolitana
I'll even say something here: I would do two fronts, one completing that toward Praça 15, Line 2, and one coming from São Gonçalo toward Niterói.
Sobre: expandir a malha metroviária e ferroviária metropolitana
We made, I made, in my administration as mayor of Rio, nine kilometers of tunnels there in Rio's port region.
Aparecem nos mesmos vídeos.